Those numbers on gravel piles — #57, #4, #8 — are sieve sizes from a standardized grading system, and as a rule the bigger the number, the smaller the stone. #57 is the workhorse: clean ¾-inch crushed rock used for driveways, drainage, and decorative beds alike. #4 runs 1.5–2 inches, #8 is the ⅜-inch material you know as pea gravel’s crushed cousin, and blends like #411 or #304 mix stone with fine dust so they compact into a hard base.
Once you can read the numbers, ordering gravel stops being a guessing game. Here’s the decoder.
What the Numbers Actually Mean
The numbers come from ASTM sieve series used to size aggregate. A stone is “clean” when it’s screened to a narrow size band with no fines (dust), and “dense-graded” or “minus” when it includes everything from the top size down to powder. Clean stone drains water; minus blends pack into a solid, load-bearing surface. That single distinction decides most projects: drainage wants clean, driveways and patios want minus.
Gravel Size Chart and Best Uses
| Grade | Stone size | Common name | Best for | Typical price |
|---|---|---|---|---|
| #4 | 1.5–2 in | — | Heavy-duty driveway base, soft spots, drainage ditch lining | $20–40/ton |
| #57 | ¾ in (some up to 1 in) | Crushed stone, driveway gravel | Driveway surface, drainage around pipes and foundations, concrete aggregate, decorative ground cover | $15–40/ton |
| #8 | ⅜ in | Pea gravel (pea is often #8 or #89) | Walkways, playgrounds, backfill around pipe, between stepping stones | $25–60/ton |
| #411 / #304 | 1.5 in down to dust | Crusher run, process, dense grade | Paver and patio bases, driveway base layer, anything that must compact | $15–35/ton |
| Riprap | 4–24 in, in classes | Shot rock, bank run large | Erosion control on slopes, shorelines, culvert and ditch outlets | $30–70/ton |
Prices are bulk, picked up or with short delivery, and swing a lot by region and fuel cost — quotes from two local yards are worth more than any national average. Bagged stone from box stores costs roughly 3–8 times the bulk price per ton, which is fine for a wheelbarrow project and painful for a driveway.
How Far Does a Ton Go?
Crushed stone runs about 1.4 tons per cubic yard, so one ton is roughly 19 cubic feet of rock. Coverage per ton:
| Depth | 1 ton covers |
|---|---|
| 2 inches | ~115 sq ft |
| 3 inches | ~75 sq ft |
| 4 inches | ~55 sq ft |
Worked example: a 200 sq ft driveway top-dressed with #57 at 3 inches needs 200 ÷ 75 ≈ 2.7 → about 3 tons. The gravel calculator handles any footprint and depth, including tons and yards at once.
Picking the Right Stone by Project
- Gravel driveway: compacted #411 as a 4-inch base, finished with 2–3 inches of #57 on top. The fines in the base lock it together; the clean #57 sheds water and stays walkable. For mud-susceptible approaches, a #4 layer below the crusher run keeps big voids under the traffic.
- Paver or stone patio: 4–6 inches of #411 or #304, compacted in lifts, with an inch of coarse sand or screening on top for bedding. Never use round pea gravel under pavers — it rolls, and the patio migrates.
- French drain or foundation drainage: #57 (or #8 around thin pipe), always clean stone with no fines, wrapped in fabric so the voids stay open. Minus blends would seal the drain they’re meant to feed.
- Walkway or garden path: pea gravel at 2–3 inches holds an edge with steel or paver restraint; #57 works with slightly larger openings and tracks less.
- Playground: pea gravel or river rock sized ⅜–1 inch, 3–4 inches deep, kept away from very young kids’ zones per your local guidance. Washed rounded stone is easier on knees than crushed.
- Decorative beds and borders: #57 in gray, or natural rounded river rock if you want a softer look. The river rock calculator sizes rounded stone, which by the ton covers a bit differently than crushed.
- Ditch, swale, or shoreline erosion: riprap sized to the water’s energy — small class stone (4–8 in) for yard swales, bigger classes for creek banks. Riprap is placed, not spread thin; the size IS the function.
Clean Stone vs. Crusher Run: The One Mistake to Avoid
The most common DIY error is ordering #57 everywhere because it’s the pretty, all-purpose pile. Underfoot where compaction matters — driveways, patios, shed pads — clean stone sits loose and rutted forever, because there’s nothing in it to interlock. And the reverse mistake hurts too: backfilling a drain with crusher run packs nearly solid and stops draining. Match the gradation to the job, not the price tag.
Ordering Without Surprises
Stone is sold by the ton (some yards by the yard — ask which), loaded by loader bucket, and dumped loose, so pick your dump spot with care because it isn’t moving afterward. Order 5–10% over your calculated need for uneven ground and spreading losses. For a deep drive, schedule the base stone first, compact it over a week of driving, then bring the surface stone — two deliveries, no puddle of mud in the meantime.
Matched to the right project, the number system becomes simple: big for drainage and stability, small for comfort, minus for compaction. Size the tonnage before the truck arrives and the whole job goes smoother.