Paver Calculator
Paver calculator: how many 12x12, 16x16 or 6x9 pavers you need, plus bedding sand and gravel base in cubic yards, with 5% or 10% cutting waste included.
Measure the patio once and this calculator does the rest: paver count with cutting waste, bedding sand, and the gravel base in cubic yards. Enter your space and the paver size you're eyeing — 12" × 12", 16" × 16" and 6" × 9" are the usual suspects — and set the waste allowance to match your pattern.
A paver patio is a layered system, not a single product: 4–6 inches of compacted crushed stone, 1 inch of bedding sand, then the pavers themselves. Walkways on firm soil can drop to 4 inches of base; driveways need 8–12 inches — base failures, not broken pavers, are what make patios go wavy.
Quick answer
A 12 ft × 12 ft patio takes 86 sixteen-inch pavers — 81 exact plus 5% for cuts
Each 16" × 16" paver covers 1.78 sq ft, so 144 sq ft ÷ 1.78 = 81 pavers, and rounding up with the 5% cutting allowance gives 86. The same patio needs about 0.44 cu yd of bedding sand (1 inch) and 2.67 cu yd of gravel base (6 inches).
pavers = area ÷ paver sq ft × (1 + waste%) · sand cu yd = area × 1" ÷ 324 · base cu yd = area × depth" ÷ 324
Calculator
How to calculate pavers for your patio
- 1
Measure the finished area
Length × width for rectangles; break L-shapes and curves into pieces and add them. Count the visible finished footprint — borders count, but nothing hidden under a fire pit or planter does.
- 2
Pick pattern and waste %
Stack bond or running bond on a square patio wastes about 5%. Herringbone, basketweave on curves, and any border-heavy layout waste closer to 10% — set the dropdown to match before you order.
- 3
Size the base by use
Walkway: 4 inches compacted. Patio: 6 inches. Driveway: 8–12 inches over firm subgrade, more over clay. The calculator's base row updates with whatever depth you enter.
- 4
Order a little extra
Concrete pavers vary slightly between production runs (dye lots), so a spare layer of full pavers beats a mismatched patch later. Leftovers fix cracked units and grade changes for years.
Paver installation tips that prevent callbacks
- Compact the gravel base in 2-inch lifts — one pass over 6 inches of loose stone compacts nothing. Each lift should stop moving under the plate compactor before you add the next.
- Screed bedding sand to a true 1 inch by pulling two 1-inch pipes as rails. More sand doesn't cushion anything; it creeps under traffic and the pavers rut.
- Sweep polymeric sand into the joints and mist it to activate — it locks the joints, resists ants and weeds, and won't wash out like loose sand does.
- Pin plastic edge restraint around the whole perimeter before final compaction — without it, the outer course walks outward a little more every winter.
- A 6-inch base for a 12 × 12 patio is 2.67 cu yd of crushed stone — about 3.7 tons. It's the cheapest line item on the job and the one every failure traces back to.