Raised Bed Soil Calculator
Raised bed soil calculator: work out cubic feet and bags for any bed size, with the 60/30/10 mix ratio and depth guides by crop. Imperial and metric.
Fill a raised bed with the wrong soil and the frame becomes a very expensive box of disappointment. This raised bed soil calculator works out cubic feet, cubic yards and bag counts for any bed size and depth, so you can buy once and fill once.
Never fill a raised bed with plain garden soil: build a mix of roughly 60% topsoil, 30% compost and 10% drainage material such as perlite or coarse sand. Garden soil alone compacts into brick inside a framed bed, drains poorly, and often carries exactly the weeds and soilborne diseases you built the bed to escape.
Quick answer
A 4 ft × 8 ft bed at 8" deep needs about 21⅓ cu ft of soil — roughly 12 bags of 2 cu ft
Split it 60/30/10: about 12.8 cu ft of topsoil, 6.4 cu ft of compost and 2.1 cu ft of perlite or coarse sand for drainage. That is 0.79 cubic yards total. Shallower beds scale down — 9 bags of 2 cu ft at 6 inches — and 12-inch-deep beds take 17 bags.
cu ft = length ft × width ft × depth in ÷ 12 · bags = cu ft ÷ bag size · +5%
Calculator
Coverage chart: how far one yard or bag goes
Coverage at a glance — find your depth and read across. “1 cu yd” is a bulk delivery (27 cu ft); bag columns show the common retail sizes.
| Depth | 1 cu yd covers | 1 m³ covers | 0.8 cu ft bag covers | 1 cu ft bag covers | 1.5 cu ft bag covers | 2 cu ft bag covers |
|---|---|---|---|---|---|---|
| 1 inch (3 cm) | 324 sq ft | 30.1 m² | 9 sq ft | 12 sq ft | 18 sq ft | 24 sq ft |
| 1.5 inch (4 cm) | 216 sq ft | 20.1 m² | 6 sq ft | 8 sq ft | 12 sq ft | 16 sq ft |
| 2 inch (5 cm) | 162 sq ft | 15.1 m² | 4.5 sq ft | 6 sq ft | 9 sq ft | 12 sq ft |
| 3 inch (8 cm) | 108 sq ft | 10 m² | 3 sq ft | 4 sq ft | 6 sq ft | 8 sq ft |
| 4 inch (10 cm) | 81 sq ft | 7.5 m² | 2.3 sq ft | 3 sq ft | 4.5 sq ft | 6 sq ft |
| 6 inch (15 cm) | 54 sq ft | 5 m² | 1.5 sq ft | 2 sq ft | 3 sq ft | 4 sq ft |
How to calculate soil for your raised bed
- 1
Measure inside the frame
Use the inside dimensions, not the outside — 2-inch lumber steals real volume from every wall. An "8 ft bed" built from 2×8 boards is closer to 7 ft 8 inches inside, and across six beds those inches add up to whole bags.
- 2
Choose depth by crop
Leafy greens, herbs and strawberries thrive at 6 inches. Tomatoes, peppers and most vegetables want 8–10 inches. Root crops — carrots, parsnips, potatoes — need the full 12 inches of loose soil to size up properly.
- 3
Calculate, then split the mix
Run the volume above, then divide it 60/30/10. The classic 4×8 bed at 8 inches (21.3 cu ft) breaks down to about 12.8 cu ft topsoil, 6.4 cu ft compost and 2.1 cu ft perlite or coarse sand — buy each ingredient to its own bag count.
- 4
Fill, water, top off
Mix ingredients as you fill — not in layers — water deeply to settle, and expect the surface to drop an inch or two overnight. Leave 1–2 inches below the rim so water soaks in instead of running over the edge.
Raised bed soil tips worth the reading time
- The 60/30/10 blend is the reliable default, but square-foot gardeners swear by Mel's Mix — equal parts compost, peat moss (or coco coir) and coarse vermiculite. It works beautifully and costs roughly twice as much per cubic foot.
- Cardboard makes the best bottom layer over grass — it smothers turf and roots through in weeks. If voles or gophers are around, add ½-inch hardware cloth first. Skip rotting logs in beds under 12 inches deep; decaying wood steals nitrogen from your crops.
- Expect the soil level to drop 10–15% in year one as everything compacts and organic matter decomposes. Keep a bag of compost on hand and top the bed back up each spring.
- Bagged "raised bed soil" is pre-blended and saves mixing, at $4–$9 per 2 cu ft. Filling the classic 4×8 bed at 8 inches takes about 12 bags — $50–$110 per bed in bagged soil.
- Past two or three beds, switch to bulk: loose topsoil plus delivered compost runs roughly $25–$45 per bed at the same 60/30/10 ratio. Your back and your wallet will both notice.